Telephone: +86 13120555503
Email: frank@cypump.com
Let’s talk about the pipeline pump everyone in municipal water, HVAC, and light industry keeps asking me about—the ISG series from Shifo Town, Anguo City, Hebei Province. It’s a single-stage, single-suction piping centrifugal unit, evolved (not merely copied) from ordinary vertical pumps by a team of local engineers working with domestic pump experts. In practice, it’s the tidy, compact workhorse you bolt into a tight plant room and then mostly forget—ideally.
Across China and Southeast Asia, specifiers are swapping legacy end-suction sets for pipeline pump stacks to simplify alignment, save floor space, and tame installation costs. Efficiency regs are tightening; IE3 motors are becoming the default, and digital monitoring—simple vibration and temp probes at least—shows up on more RFQs than last year. Honestly, it’s about lifecycle math, not hype.
| Flow (Q) | ≈1.5–400 m³/h (real-world use may vary) |
| Head (H) | ≈5–125 m |
| Speed | 1450/2900 rpm |
| Motor | IE2/IE3, IP55, F-class insulation |
| Efficiency | Up to ≈82% at BEP (grade varies by size) |
| Temperature | -20–120°C (hot-water type up to ≈150°C) |
| Casing/Impeller | HT200, CF8/CF8M optional; shaft 2Cr13/SS304/SS316 |
| Seal | Mechanical seal (SiC/SiC, TC/TC), cartridge optional |
| Working Pressure | PN10/PN16; flanges ISO 7005 / GB/T 9113 |
Materials come in from vetted foundries; castings are UT/VT screened, then machined and dynamically balanced (impeller per ISO 1940 G6.3, typically). Hydrostatic tests hold at 1.5× rated pressure; performance is verified to ISO 9906—usually Grade 2B unless you specify tighter. I’ve seen seals run 12–24 months on clean water; overall service life, with reasonable water quality and alignment, clocks around 20,000–40,000 hours before major overhaul. To be honest, bad suction conditions kill more pipeline pump units than anything else—NPSH matters.
| Vendor | Origin | Certs | Lead Time | Customization | Warranty |
|---|---|---|---|---|---|
| CY Pump (ISG) | Shifo Town, Anguo, Hebei | ISO 9001; ISO 9906 test record | ≈15–30 days | Materials, seals, IE3/VFD kits | 12–18 months typical |
| Import Brand | EU | CE, ISO 9906, sometimes ISO 5199 | 30–60+ days | Broad, pricier | 18–24 months |
| Local OEM | Regional | Varies | 7–25 days | Limited | 6–12 months |
Options include 316 stainless wet ends for mildly corrosive loops, double mechanical seals with plan flushing, epoxy-lined casings, and smart sensors for vibration/temperature trending. For hot water, I’d specify high-temperature elastomers and a stubby spacer coupling—it saves knuckles.
A northern city loop swapped twelve legacy horizontals for ISG-type pipeline pump sets with VFDs. After commissioning, utility logs showed ≈18% energy reduction at similar duty, plus fewer calls about seal drips. Not a lab trial—just a practical win.
Factory acceptance to ISO 9906 (Grade 2B baseline). For petrochem-like specs, some buyers request API 610-inspired clauses even on pipeline pump units—overkill sometimes, but it tightens QA. Many customers say the sweet spot is pairing IE3 motors with VFDs and keeping operation near BEP to extend seal life. CE and ISO 9001 documentation are available on request.
References: