Telephone: +86 13120555503
Email: frank@cypump.com
If you’re speccing a non clog sewage pump for a busy municipal line or a chaotic construction site bypass, here’s the insider brief. The WQ series out of Shifo Town, Anguo City, Hebei Province blends imported design cues with very down-to-earth Chinese manufacturing polish. To be honest, it’s the anti-winding behavior and automatic installation/control that operators keep talking about—and yes, the electricity bills trend lower too.
Utilities are quietly standardizing on larger solids passages, vortex/single-channel hydraulics, IE3-efficiency motors, and smarter controls with moisture probes. In fact, many customers say clogs are now more about wipes and rags than grit—so hydraulic geometry matters as much as motor power. The WQ line’s “non-clog + anti-winding” combo is timely, and surprisingly, it’s the auto-coupling install kits that save the most downtime during change-outs.
| Series | WQ Submersible Sewage, non clog sewage pump design |
| Flow range | ≈ 10–3000 m³/h (real-world use may vary) |
| Head | ≈ 5–60 m |
| Power | 0.75–160 kW, 50/60 Hz |
| Solids passage | Up to 100 mm (vortex/single-channel options) |
| Materials | HT200/ductile iron; 304/316 SS optional; wear overlays available |
| Seals | Double mechanical seal, SiC/TC, oil chamber + moisture probe |
| Motor | IP68, Insulation Class F/H; IE2/IE3 options (IEC 60034) |
| Install/control | Auto-coupling guide rail; float/PLC; thermal protection |
| Service life | ≈ 40,000–60,000 h with proper maintenance |
| Testing | ISO 9906 Grade 2B acceptance; routine pressure/leak tests |
Municipal lift stations, WWTP headworks, food and beverage effluent, textile wastewater, livestock farms, tunneling bypasses—anywhere rags like to party. The non clog sewage pump geometry (vortex/single-channel) reduces stringy buildup, and the auto-install kit means minimal wet-well downtime. Energy-saving IE3 setups are increasingly standard for 24/7 stations.
| Parameter | CY WQ | Global Brand A | Local OEM B |
|---|---|---|---|
| Solids passage | Up to 100 mm | ≈ 76–100 mm | ≈ 65–80 mm |
| Motor efficiency | IE2/IE3 optional | IE3 common | Varies |
| Coating DFT | ≈ 250 μm | ≈ 200–300 μm | ≈ 120–200 μm |
| Certifications | CE, ISO 9001/14001 | CE, UL/CSA | CE (varies) |
| Lead time | ≈ 15–25 days | ≈ 6–8 weeks | ≈ 20–35 days |
| Price band | Mid | High | Low–Mid |
Options include duplex stainless hydraulics, hardened wear rings, explosion-proof motor, cutter/vortex impellers, longer cables, and PLC panels. The non clog sewage pump platform accepts moisture probes and external VFDs for duty/assist control.
Three WQ units replaced legacy dry-pit pumps. After six months: 12–15% kWh reduction at BEP, clogging incidents from weekly to “almost none,” and mean time between service stretched beyond 4,000 h. Operator’s note: “Rag balls don’t stick like before.” Test-bench spot check per ISO 9906 showed peak efficiency ≈ 72% at 0.9–1.0 BEP.
References