Telephone: +86 13120555503
Email: frank@cypump.com
I’ve spent enough time around flood stations and fish farms to know the label on the nameplate isn’t the whole story. Many customers say they “need an Axial Flow Pump,” but once we map the duty points—big flow, a touch more head—what they actually need is a mixed-flow workhorse. Case in point: the HW Mixed Flow Pump from Shifo Town, Anguo City, Hebei Province. It blends the huge mass flow of an Axial Flow Pump with the extra pressure you’d expect from centrifugal designs. And yes, it’ll happily move clear water or turbid, slightly contaminated liquids.
Cities are upgrading drainage, agriculture needs dependable irrigation, and coastal projects face brackish, sandy water. In these conditions, a pure Axial Flow Pump can hit efficiency ceilings at modest head. Mixed-flow designs slot neatly in: higher flow than standard centrifugal, more head than axial—sweet spot covered. To be honest, that’s why you’re seeing more mixed-flow selections in bid specs, especially in Asia-Pacific flood-control corridors.
| Flow range | ≈ 0.3–20 m³/s (real-world use may vary) |
| Head | ≈ 3–25 m |
| Efficiency at BEP | around 78–86% |
| NPSHr | ≈ 2–6 m (duty dependent) |
| Materials | Cast iron (HT200/HT250), optional 304/316 SS impeller; epoxy coat for brackish use |
| Shaft seal | Packing or mechanical seal (carbide faces for sandy water) |
| Bearings | L10 life ≈ 20,000–40,000 h |
| Install | Vertical sump, inclined or horizontal |
| Service life | 10–15 years with normal maintenance |
| Performance tests | ISO 9906 Grade 2B/1B; HI 14.6 acceptance |
Flood control and stormwater stations, irrigation/drainage canals, cooling-water intake, aquaculture, and municipal bypass—any job where an Axial Flow Pump would be considered but you need a bit more head or grit tolerance.
| Vendor | Strengths | Certs | Lead time | Notes |
|---|---|---|---|---|
| HW Mixed Flow Pump (Shifo Town, Anguo City, Hebei) | High flow, moderate head; robust for turbid water; custom shafts/impellers | ISO 9001, CE (motors) | ≈ 20–45 days | Good price-to-performance; local service partners growing |
| Global Brand A | Premium metallurgy; advanced VFD packages | ISO 9001/14001, UL/CSA | ≈ 8–12 weeks | Higher capex, strong global service |
| Regional Brand B | Fast delivery; basic options | ISO 9001 | ≈ 10–30 days | Limited corrosion packages |
Bottom line: if your curve wants the volume of an Axial Flow Pump but you’re chasing a few extra meters of head (and reliability in less-than-pristine water), this mixed-flow line is the practical choice. I guess that’s why spec writers keep nudging toward it.